Combine PV generation, a compatible inverter and storage to support priority circuits during grid outages. Runtime depends on selected loads, usable battery capacity and generation conditions.

Service scope

Backup designed for the right loads

Design starts by deciding which equipment must keep running, for how long, and with what power and starting-current requirements.

Priority-load mapping

List lighting, internet, refrigeration, gates, pumps or other essential equipment.

Runtime estimate

Approximate sizing based on load power and expected operating hours.

Compatible inverter and batteries

Selection based on voltage, continuous power, surge demand and manufacturer specifications.

Backup circuit separation

Define which circuits will receive backup and which remain outside the backed-up system.

Solar integration

Review the relationship between modules, inverter, storage and utility supply.

Operating guidance

Guidance for monitoring, usage limits and battery-system care.

Autonomy planning

Backup sized carefully, without unrealistic promises

Batteries do not provide unlimited power. Runtime depends on usable capacity, simultaneous demand, losses, state of charge and the ability to recharge from solar.

Clear priorities

The solution focuses on equipment that is essential to the property’s operation.

Transparent runtime assumptions

Consumption and runtime assumptions are made clear before work begins.

Safe integration

Electrical compatibility, protections and installation require technical review.

Project stages

Load review, sizing and integration

A detailed survey prevents overstating backup runtime and helps select compatible equipment.

01

Equipment list

We identify power, voltage, quantity and usage hours.

02

Calculation and specification

We estimate required inverter and battery capacity.

03

Integration design

We define circuits, protections and integration with the existing installation.

04

Commissioning and guidance

We check operation and explain monitoring and usage limits.

Plan your backup

Which devices must stay on during a power outage?

Share your priority loads and expected runtime to start a technical sizing process.

Request an assessment